Some interesting stuff this week. Who is the playing pitch for on the Oldcourt Road, Capami? Link between Presbytery and Iona Centre for Knocklyon. IT Tallaght plans further expansion. The old Our Lady’s Nuns house beside the school been converted to apartments. Change in plans by Broadcrest on the Scholarstown Road (surprise, surprise!!). Another big housing development in Lucan. Sorting out the Housing Crisis is so slow. How come we take so long to put up Modular Houses and they seem to cost as much as regular houses,something amiss.
Planning Decisions to the 14th of October,2016
SD16A/0055 12-Oct-2016 Permission Additional Information
Applicant: Colm Perry
Location: Rear of, 665, Ballycullen Cottages, Ballycullen, Dublin 16
Proposed Development: 1 x 4 bedroom 3 storey detached dwelling with new access via Hunters Avenue. 1 x 4 bedroom 2 storey detached dwelling & 2 x 3 bedroom 2 storey semi-detached dwellings with new access via Hunters Court (4 dwellings in total). Works to include all associated infrastructure and site development including drainage, landscaping and boundary treatments.
SD16A/0059 13-Oct-2016 Permission Additional Information
Applicant: Capami Ltd
Location: Site south of Oldcourt Road and East of Oldcourt Lane, Oldcourt Road, Ballycullen, Dublin 24
Proposed Development: Playing pitch, including associated site works, on a site area of 1.97 hectares, located on Oldcourt Lane, south of Oldcourt Road, Oldcourt, Ballycullen, Dublin 24. Access to the pitched will be via an existing lane off Oldcourt Road.
SD16A/0165 10-Oct-2016 Permission Additional Information
Applicant: Sheelin McSharry
Location: Bushy Park House, Templeogue Road, Templeogue, D6W
Proposed Development: Internal and external alterations and a change of use to Bushy Park House (a protected structure – RPS Reference: 214) and to the existing basement extension (total gross floor area 1,781sq.m) from education/science and technology use (previously permitted under permission Reg. Ref. S99A/0664) to residential use. The proposed development will result in the provision of 17 apartments consisting of 8 no. 1 bed units and 9 no. 2 bed units. The proposed development involves internal and external alterations including the insertion of 5 new internal staircases from basement to ground floor, new internal partition walls, new external escape staircase at basement level, replacement of existing uPVC windows and doors with timber windows and doors to match the original, extension at attic level to form a new tank room (13sq.m), demolition of existing lift lobby to basement extension (3.9sq.m) and replacement with ground and basement lobbies enclosing the existing staircase from basement (21.8sq.m), 2 basement extensions (11sq.m and 17sq.m) into existing car park, demolition and replacement of existing non-original basement porch. 18 car parking spaces and 17 bicycle spaces will be allocated to the proposed residential development. Access to the development will be via the existing access to the Bushy Park Residential Development at Templeogue Road. The proposed development includes all associated site development, services and landscaping works.
SD16A/0353 12-Oct-2016 Permission New Application
Applicant: Fr. Martin Parokkaran O.Carm.
Location: Iona Centre Parish Pastoral Centre Building, Knocklyon, Dublin 16
Proposed Development: Construction of an 8.3sq.m single storey building at the south west corner of the Iona Centre to link the presbytery with the Iona Centre together with a new entrance lobby, two single storey infill offices and internal ancillary alterations.
SD16A/0355 13-Oct-2016 Permission New Application
Applicant: Broadcrest Ltd.
Location: Site south of Scholarstown Road, West of Stocking Lane, North of Ballyboden Waterworks and east of Woodfield, Ballyboden, Dublin 16
Proposed Development: Modifications to 6 permitted two storey, two bed units (type 3C & 3D) to convert to 6 two storey three bed units (types 1A & 1B).
SD16B/0329 10-Oct-2016 Permission New Application
Applicant: Finbarr Costello
Location: 4, Woodstown Walk, Dublin 16
Proposed Development: Construction of a single storey extension to the rear and side with tiled hipped roof and new roof lights, and two storey extension to rear with hipped roof and all associated internal alterations, site drainage and landscaping works.
SD16B/0334 12-Oct-2016 Permission New Application
Applicant: James E. Keyes
Location: 88, Dodder Road Lower, Dublin 14
Proposed Development: Increase the width of the driveway opening to 3.2m; remove existing extensions to rear at ground level; construct new two storey extension to side and rear of existing house, including one new door and two new bathroom windows on the side elevation; ground floor extension to rear of existing house; attic conversion and new dormer window at roof to rear elevation; ‘Velux’ rooflight to hip part of roof at side elevation.
SD16B/0335 12-Oct-2016 Permission New Application
Applicant: Stuart Dicker
Location: 84 Kiltipper Drive, Aylesbury, Tallaght, Dublin 24.
Proposed Development: Single storey extension to front side and rear of property
SD16A/0099 GRANT PERMISSION 10-Oct-2016
Applicant:Institute of Technology Tallaght (ITT)
Location:Institute of Technology, Old Blessington Road, Tallaght, Dublin 24.
Proposed Development: 10 year planning permission for the construction of 2 third level educational buildings and an outdoor playing pitch, located to the east of the existing main building. The development will consist of: (1) A sport, science, health and recreation building with brick and stone cladding finish containing a single storey sports hall with teaching accommodation and associated facilities, arranged over two storeys plus roof plant areas, total floor area 3,280sq.m., a grass playing pitch 140 x 90m with flood lighting, score boards, 1m high spectator barrier, 12m high x 25m wide ball catch nets behind goal posts and spectator seating. (2) A four storey building plus roof plant areas, with brick and stone cladding finish, containing a full height atrium space with general teaching accommodation consisting of classrooms and computer rooms, teaching kitchen facilities and restaurant with production kitchen, ancillary store rooms and class kitchens, technical development teaching accommodation with various engineering and other technical laboratories and post grad study area, meeting rooms and administration offices, total floor area 6,402sq.m. (3) A new entrance formed on the east facade of the existing main building with new single storey entrance lobby, total floor area 22sq.m. (4) A new external landscaped quadrangle, pedestrian areas, footpaths and landscaping, linking existing facilities with development. Building signage, 50 covered bicycle parking spaces, covered walkways, refuse storage, relocation of 70 existing car parking spaces and associated site works are also included. (5) Enhanced pedestrian crossing facilities at Greenhills Road access, comprising new raised entry treatment across access and pedestrian refuge island on Greenhills Road with associated road markings and traffic signs. The development may be constructed in phases. This application site is centrally located within the ITT campus, which is bound by Belgard Road to the west, industrial buildings accessed off Airton Road to the north, Greenhills Road to the east and to the south by Old Blessington Road and the grounds of the Old Priory, Tallaght.
SD16B/0279 GRANT PERMISSION 10-Oct-2016
Applicant:Siobhan Monaghan
Location:1, Knocklyon Cottages, Knocklyon Road, Dublin 16
Proposed Development: Demolition of existing sub standard extension to rear and for erection of new two storey kitchen, living room, utility room bedroom and bathroom extension to rear with internal alterations to existing house including the replacement of the front door with a new double glazed window and all associated site and drainage works.
SD16B/0281 GRANT PERMISSION 12-Oct-2016
Applicant:Martina Dempsey
Location:6, Eden Grove, Grange Road, Rathfarnham, Dublin 16
Proposed Development: Conversion of attic to useable storage space, placement if 1 new ‘Velux’ window in roof to front and 2 ‘Velux’ windows in roof to rear, removal of hip section of main roof and building up gable block wall to form a half hip and insertion of new window in gable wall at attic level.
SD16A/0342 INVALID APPLICATION 10-Oct-2016
Applicant:Sorcha & Donal Regan
Location:31, Coolamber Court, Knocklyon, Dublin 16
Proposed Development: Construction of a new detached two storey dwelling to side of existing two storey semi-detached dwelling. The development will comprise of the demolition of existing single storey side extension, the construction of a new detached two storey dwelling to side, new front entrance gateway to dwelling and all ancillary works.
SD16A/0306 REQUEST ADDITIONAL INFORMATION 13-Oct-2016
Applicant:Crekav Trading GP Ltd.
Location:Lock Road/Newcastle Road (R120), Finnstown, Lucan, Co. Dublin.
Proposed Development: Demolition of the existing single storey gate lodge dwelling and the provision of 80 residential units consisting of the following: 39 no. 2 storey dwelling houses comprising 26no. 4 bedroom houses and 13no. 3 bed houses; a 3 storey + 1 storey setback apartment block comprising 8no. 1 bed apartments, 20no. 2bed apartments, and 5no. 3 bed apartments with balconies to east, west and south elevations; and a 3 storey duplex block comprising 4no. 2 bed duplex units and 4no. 3 bed duplex units with terraces at 1st floor level to south elevation. The proposed development will also include landscaping, play and exercise area, boundary treatments, bike and bin storage, internal roads and footpaths and all associated engineering and site development works and site services necessary to facilitate the development. Vehicular and pedestrian access to the application site is to be from a new access from the adjoining Lock Road/Newcastle Road (R120) to the west ; pedestrian accesses are proposed into Finnstown Neighbourhood Centre in the north-west of the site, and to Newcastle Road to the west of the site; all on lands of approximately 2.035 hectares, which are generally bound to the north by Finnstown Neighbourhood Centre, to the east by Finnsview, to the sout by Finnsgreen and to the west by the Lock Road/Newcastle Road (R120). The site excludes adjoining lands affected by Tree Preservation order number TPO/0005.