Metro South West Group who attended the oral hearings into Metrolink made a detailed submission at that time to the Board in connection with the planning application by Transport Infrastructure Ireland.
Subsequently, TII submitted a substantial number of documents in response to the submissions from many areas around their original Application. As a result An Bord Pleanala invited people who had made submissions to respond to TII. This is the details of our response to TII that we made last week to An Bord Pleanala.
